Water Fees and Charges


Readiness to Serve Charge

Effective:  May 1, 2005

Monthly Fee

5/8” – 3/4” meter $ 10.00
1” meter $ 20.00
1-1/2” meter $ 40.00
2” meter $ 60.00
3” meter $ 120.00
4" meter $ 150.00
6" meter $ 250.00
8" meter $ 400.00
10" meter $1,000.00
12" meter $1,500.00
6” weir $ 11.00
9” weir $ 11.00
10” weir $ 20.00
12” weir $ 20.00
24” weir $ 35.00
30” weir $ 60.00


Commodity Charge

hcf = per 100 cubic feet in volume which is equal to 748.05 gallons. Effective:  July 1, 2017 Fee per hcf
Tier 1 Up to full entitlement $ .68

Tier 2 -  Usage up to twice the entitlement (supplemental) - Effective 7-1-2017

Tier 3 - excess usage over double the entitlement  - Effective 7-1-2017                

$ 1.78

$ 3.78

Miscellaneous Charges -  Effective Sept. 1, 2013

Item Fee
Meter Tampering Fee (First Violation) $ 30.00 + cost
Meter Tampering Fee (Second Violation) $ 50.00 + cost
Meter Tampering Fee (Third Violation) Legal Action
Meter Testing On-site (Consumer requested) $ 70.00 (refundable if meter is faulty)
Meter Testing Off-site (Consumer requested) Actual Cost (refundable if meter is faulty)
Returned Check (NSF) $ 25.00
Late Payment Fee $ 5.00 per final notice
Service Re-establishment Fee (before 3 p.m.) $ 40.00
Service Re-establishment Fee (after 3 p.m.) $ 80.00
Stock Transfer (w/original stock certificate) $ 30.00 (per stock generated)
Stock Transfer Fee (w/Lost Instrument Bond) $ 60.00
Stock Transfer Fee (w/Affidavit & Indemnity) At Cost
Returned Stock Monthly Storage Fee $10.00/month
New Development Plan Check 3 % of estmtd wtr system construction cost
Construction Permit & Inspection 5 % of apprvd wtr system construction cost
Quit Claim [Easements]    $1500.00 min.-any add'l costs paid by requestor
Jumper w/Back Flow Valve $ 100.00/month

 

Water Hydrants

Construction Actual Cost
Hydrant Meter Application/Permit $50.00
Hydrant Meter Deposit $850.00 (refundable if returned in same condition)
Hydrant Meter Monthly Fee $65.00


Capital Facilities Connection

Effective Sept. 1, 2013

 
5/8” – 3/4” meter $ 3,350.00
1” meter $ 5,691.00
1-1/2” meter $ 10,725.00
2” meter $ 20,800.00
3” meter eliminated
4” meter $ 56,907.00
6" meter eliminated
8" meter eliminated
10" meter eliminated
12" meter eliminated


Meters – Installation of New or Upgrade Effective 6/1/2014

SIZE METER & BOX SVC. LATERAL TOTAL for BOTH
5/8” – 3/4” $ 584.00 $ 2,579.00 $ 3,163.00
1” $ 677.00 $ 2,579.00 $ 3,256.00
1-1/2”  $ 1,089.00 $ 2,792.00 $ 3,881.00
2" $ 1,308.00 estimate $ 1,308.00 + est.
3" eliminated eliminated eliminated
4" eliminated eliminated eliminated

Upgrade from a 5/8” meter to a 1” meter will be estimated.  Capital Connection Fee Variance for 5/8" to 1" is $2,341.00. Note: Please refer to the Capital Facilities Connection fees to determine the variance in the requested upgrade for meter size 1" and above.